Mobius MegaBlog

Mobius Event Horizon — all the news that's fit to print.

Podcast Blast!

Filed under: Events, Expansion, Miscellaneous, Mobius, News, Video, audio, how-to, interviews, mp3, podcast — admin at 12:04 pm on Saturday, July 18, 2009

mobiusmegatar-podcast-coverart-170

Yo, yo, yo, yo, yo! Check it out!

Oh, no wait. That’s not my style. I’m way too distinguished to be talking that way.

That’s right. Pirate talk is better for Traktor.

Yo, ho, ho, ho, ho! Arrrgh! Matey, be sharp and keep a sea-eye out. Rumor be that-

Oh, never mind.

New Megatar Touchstyle Podcast

Let’s just say that we have a new Podcast Channel on the Mobius Megatar website. You should see the little blue button on the upper right on the main website.

The Podcast Channel will have more and more songs and videos, including –

  • Performance Videos from two-handed Mega-Tappers around the world
  • How-To Videos on subjects of interest to touchstyle players
  • Songs showing off two-handed touchstyle play
  • Interviews with touchstyle musicians

Please join us on the Megatar Touchstyle Podcast.

Also available through the Apple iTunes system.

.

Finishing a Megatar

Filed under: Design, Expansion, Factory, Finishes — admin at 8:41 pm on Tuesday, October 7, 2008

Here at the Megatar World Headquarters, we’ve really been enjoying our new shop. Partly because we have lots more room. Partly because we have a separate room for the LOUD MACHINES!

And partly because we have our own spraybooth, so we can control our finish process much more completely.

I’ve drawn a rough diagram of how it’s laid out –

Rough Diagram of Megatar Spraybooth

This photo, taken just outside the spraybooth door, shows a detail of the Incoming Air Filters (on right hand side of the diagram above). These filters keep sawdust and fine dust particles out, while allowing clean air to flow easily into the spraybooth. This incoming soft airflow makes controlling the fine spray of finish easier.

Inside the spraybooth, a powerful exhaust fan draws the air *out* of the spraybooth. There is a second set of air filters in front of the exhaust fan, to prevent a build up of finish particles from accruing to the fan. So, we filter the air coming in, to keep out dust, and we filter the air going out, to keep the fan clean.

Detail - Spraybooth\'s Inbound Air Filters

The finishes we use are quite beautiful, and they protect the instrument. Protection of the instrument is the *number one job* of a finish. However, our finishes are also eco-friendly. They don’t pollute the air, they don’t create dreadful fumes for us to breathe, and they don’t contain volatile solvents that suddenly explode in a great ball of fire. We think that’s important.

Below is a batch of four Megatars. They’ve come off the computer cutting machinery, and Patrick (the shop foreman) has already smoothed and sanded them, so the contours are pleasing to the eye and the touch.

The two blondies on the left and right will probably become TrueTappers — Eclipse, Dragon, or Storm — and the two dark wood instruments in the middle have parallel frets, so they will become either MaxTappers, or perhaps Dark Dragons, or Dark Storms.

The black paint inside the pickups cavity in the body is a conductive paint. This shielded paint, attached to a layer of copper foil on the underside of the pickups array (when we later install it), makes a Faraday cage around the electronics, to shield them from radio-frequency interference (noise or humming). The green protective tape covers the fretboards of the dark-wood instruments, because the dark-wood fretbooards feel (and look) better with a polymerized oil finish, which we’ll rub into the fretboard in a later step.

A spraybooth \'batch\' - four Megatars

The next step of hand-finishing: Below you see Patrick sanding (again) at the prep table, after applying a wood-filler that seals the pores in the wood. This first step helps the finish to protect the instrument.

You want to create a strong barrier against the wood either gaining or losing water vapor from the air.  Wood filler of the correct type, sanding, and then multiple thin coats of finish with sanding between coats still makes the most beautiful, and the most protective finishes.

No substitute for fine hand-sanding.

Below is the batch of four Megatars, each awaiting their turn for the next coat of finish to be applied.

While we are spraying one of them, these hooks keep the others out of the airflow. We want them to have just enough finish, and not too much! That makes for the greatest beauty, and the best protection.

Batch of four Megatars awaiting their turns.

Below is Patrick, our finishing expert, with Mr. Spraygun.

We use an air-turbine driven high volume, low pressure system, as this technology applies thin even coats, is easier to apply very smoothly, and less finish is wasted in overspray during the process.

Patrick and Mr. Spraygun, ready to rock!

Below we can peek over the shoulder of the artist at work. The entire trick is a smooth even motion that applies an even thin coat of finish to the entire instrument. It also helps to have lots and lots and lots of light! (Our booth has two natural-light windows, plus three fluorescent arrays, and some incandescent lighting as well.)

Behind the Megatar you can see the outgoing air filters that keep any overspray finish off the exhaust fan, which is mounted in the box-like shape behind the filters. On the wall just below the lamp in upper left, is a thermo-hygrometer so we can keep track of temperature and relative humidity, extremes of which can affect finishes to a surprising degree.

We experimented with several different ways of suspending the Megatar while applying the finish. The simple solution shown here is the one that gave the best results. A thick electrical wire of moderate stiffness is affixed to the ceiling, and simply by threading it through one of the tuner holes, the Megatar is suspended safely and securely.

The trick with finish is to get just enough, and all even.

We’re really blessed to have our nice shop, and we’re lucky to have our own spraybooth. It’s a simple technology, but it’s enabled us to get a more consistent (and more beautiful) finish on all of the Megatars that ship out the door. Protects them, and keeps them beautiful.

We like it!

Mobius Factory — Back in Full Production!

Filed under: Expansion, Factory, Mobius — admin at 4:34 pm on Sunday, January 27, 2008

We’re back in full production, faster and better than ever before!

Finally the big move day came, and we were ready to box up and move all the assembly stations, all the parts, all the shop tools, and supplies and the hundreds of jigs and special devices that go to make Mobius Megatar instruments, so you can make music!

(1) The Big (empty) Assembly Room — before move-in day:

901-emptyshop-400px.jpg

… and after moving in …

(2) The fretboard tools, where we cut fretboards to precise size before they get assembled onto the instruments:

902-fretboardtools-400px.jpg

(3) After computer-cutting machine #1 (Bobby) has cut the fretboards, he cuts out the 3D neck, and then cuts out the instruments. Just like paper dolls, only much, much louder!

903-robotcutsoutmegs-400px.jpg

(4) The pickups-array jig tools, where we make the pickguards to be loaded with pickups, electronics, active circuit preamps, piezo and midi circuit boards, tone/volume knobs, and stereo outjacks …

904-pickguardtools-400px.jpg

(5) The sanding station, where sanding and rasping prepare the cut-out Megatars for the finishing booth:

905-sandingstation-400px.jpg

(6) The finish station, where we mix our finishes and sand the instruments between coats …

906-finishstation-400px.jpg

(7) Parts Store A, where we keep about a third of the small parts that go into the making of a Mobius Megatar instrument …

907-partsstorea-400px.jpg

(8) The assembly table, with new-cut instrument far right, and instruments nearing completion with finish and frets and pickups on the left:

908-assemblytable-400px.jpg

(9) The ‘Almost Ready’ stock of completed and boxed instrument bodies ready for fast assembly into the custom instrument of your specification:

909-almostready-400px.jpg

(10) The shipping station, with two Megatars boxed (on right) and ready for shipping around the world:

910-shippingmegsready-400px.jpg

(11) Patrick (shop foreman) working on a fretboard …

911-patrickprepsfretboard-400px.jpg

(12) Traktor testing the Feiten Intonation System on an instrument that’s ready to ship out:

912-traktorfeitens-400px.jpg

(14) Shop dog Charlie, who will watch out for cats …

914-shopdogcharlie-400px.jpg

We’re just delighted with the new shop. Triple the space, and more work stations, to keep the jobs flowing smoothly.

While the computer-cutting machinery was disassembled for moving, we upgraded the electronics, to get even greater precision than before (though your eye will not see it), and faster production as well!

Now that we have our own spray booth on premises, we’re getting better finishes than ever before, and it eliminates the production delay of sending instruments out.

We still need more shelving for parts storage and more lighting, but all essential functions are reconstructed, and working better than ever before, to deliver Megatar instruments faster and better (and prettier) than ever before.

Everybody wins.

We like it. Even shop dog Charlie (and shop dog Daisy) like the new digs. And we think you’ll enjoy your new Mobius Megatar instrument, made better and delivered to your door more quickly than ever before.

Our voyage is complete. Thanks for coming along with us.

Mobius Factory – Going to Work!

Filed under: Expansion, Factory, Mobius, News — admin at 7:25 pm on Monday, January 7, 2008

We’ve got the walls complete, and painted!

Now it’s time to start putting Megatar-Building stuff in the new shop …

(1) The Big Room — Where Megatars will get built:

81-thebigroom-400px.jpg

(2) Beginning to set things up — the Shipping Station:

82-begintosetup-400px.jpg

(3) Spray Booth, with Exhaust Filters:

83-sprayboothfilters-400px.jpg

(4) The Computer Cutting Room — It’s Alive!

84-thecncroom-400px.jpg

(5) Computer-Cutting Machine #1:

85-windowintocncroom-400px.jpg

(6) Megatars emerge from the wood …

86-megsinprogress-400px.jpg

(7) Mission Control (the Communications Office):

87-missioncontrol-400px.jpg

The Communications Office is functional, computers and network online.

The spray booth is tested and working, and giving us better finishes than ever before, and we’ve been able to use an environmentally-friendly finish with less toxic fumes (for us and for you!).

The first computer cutting machine is installed and making new Megatars already.

We’ve got lots of work yet to do installing more lighting, building more shelving, and tweaking the workspace. But first …

Next week, tons of tools and parts and assembly benches show up.

Stay tuned. More to follow.

Mobius Factory – More Walls

Filed under: Expansion, Factory, Mobius, News — admin at 6:57 pm on Saturday, October 20, 2007

We’ve been wanting more walls, and so …

(1) Creating the Computer-Cutting Room:

71-computercuttingroom-400px.jpg

(2) The Communications Office, down there at the far end …

72-officebeyond-400px.jpg

(3) Glenn and Jesse measure twice, cut once:

73-measureandfasten-400px.jpg

(4) The Big Room — Where the Megatars get built.

74-thebigroom-400px.jpg

(5) Peeking into the Communications Office from the Big Room:

75-peekintooffice-400px.jpg

(6) Jesse builds a Spray Booth …

76-buildingspraybooth-400px.jpg

(7) Jesse measuring and cutting:

77-measureandcut-400px.jpg

(8) and still … watching out for cats:78-watchoutforcats-400px.jpg

It’s got rooms now, so painting them will be next.

Stay tuned. More to follow.

Mobius Factory – Prepping the Walls

Filed under: Expansion, Factory, News — admin at 8:31 pm on Friday, September 14, 2007

The walls have been begging for attention, and so …

(1) Insulation guys check the work order:

61-insulationguys-400px.jpg

(2) Insulation installation … all tidy!

62-alltidy-400px.jpg

(3) Shiny stuff to keep the roof real cool, man:

63-shinyroofinsulation-400px.jpg

(4) Whoah! Mongo insulation!

64-mongoinsulation-400px.jpg

(5) Walls covered, Jesse Senior and Bob put stuff away:

65-sheathingcrew-400px.jpg

(6) A toast to the new walls:

66-toastingthesheathing-400px.jpg

(7) And watching out for cats:

67-watchingforcats-400px.jpg

It begins to resemble a shop.

Stay tuned. More to follow.

Mobius Factory – Paint and Power

Filed under: Expansion, Factory, News — admin at 6:24 am on Wednesday, August 29, 2007

The Painting Team has arrived –

(1) Glenn and Jesse on the job:

51-thesprayteam-400px.jpg

(2) Jesse sprays low:

52-jesssprayslow-400px.jpg

(3) Jesse sprays high:

53-jesssprayshigh-400px.jpg

(4) Ann paints the trim:

54-annpaintstrim-400px.jpg

(5) Pretty in the front:

55-paintedinfront-400px.jpg

(6) Pretty at the back:

56-paintedinback-400px.jpg

(7) Pretty big loading dock:

57-paintedloadingdock-400px.jpg

(8) Here comes power!

58-powercomingin-400px.jpg

(9) Mongo-big new panel:

59-mongopowerpanel-400px.jpg

(10) Old soldier, cast aside:

60-oldsoldier-400px.jpg

The outside nears completion.

The inside comes next.

And, soon, Megatars come rolling out!

Stay tuned. More to follow.

More Mobius Factory Update …

Filed under: Expansion, Factory, News — admin at 5:59 pm on Sunday, August 19, 2007

The roof and walls are done, so now we make it functional –

(1) The Loading Dock door, from outside:

41-LoadingDockOutside

(2) And from inside:

42-LoadingDockInside

(3) Finding the pipes:

43-SearchingForPipes

(4) Pipes around the corner!

44-AroundTheCorner

(5) Bernadette will help!

45-Bernadette

(6) Pipes marching toward the shop:

46-AndToTheShop

(7) Glenn’s little shovel:

47-GlennLittleShovel

(8) Glenn’s big shovel:

48-GlennBigShovel

(9) The artist at work:

49-ArtistAtWork

It’s fun watching Glenn finesse that big yellow fellow around!

Next week: Electricity.

Stay tuned. More to follow.

New Mobius Factory Update …

Filed under: Expansion, Factory, News — admin at 11:40 pm on Wednesday, August 8, 2007

The windows were installed, so now the walls can go up –

(1) Wrapping Tyvek all around (keeps out the wet):

31-Wrapping Tyvek all Around

(2) Up goes the siding:

32-UpGoesSiding

(3) Jess trimming and caulking:

33-JessTrimmingAndCaulking

(4) Trim around windows! Trim around doors!

34-WindowTrimAndDoorTrim

(5) The back windows:

35-The Back Side

(6) The view out the back windows:

36-View Out the Back Windows

(7) Awaiting the big door, and watching out for cats:

37-Watching Out for Cats

The big door is scheduled for installation in about a week, and the electrical panel is going in soon. Then a visit from the Building Inspector. He’s just a fine fellow!

Stay tuned. More to follow.

New Factory News …

Filed under: Expansion, Factory, News — admin at 12:10 am on Friday, July 27, 2007

This last week, construction has moved forward.

Now we’ve got walls, trusses, eaves, a roof, shingles, and the beginning of siding going up. Here are some photos –

(1) The spray booth will go here:

==1-Spray Booth

(2) The loading dock goes here:

2-Loading Dock

(3) The office door goes here:

3-Office Door

(4) Roof trusses have been delivered atop the walls:

4-Roof Trusses

(5) Upsy-Daisy! Up we go!

5-Up We Go

(6) Roof trusses all installed:

6-Roof Trusses Installed

(7) Glenn and Jess building the eaves:

7-Building the Eaves

(8) Jess and Glenn laying the roof:

8-Laying the Roof

(9) By golly! We have a roof!

9-We Have a Roof

(10) Jess Senior and Bob adjust a thing-gummy:

10-Adjusting a Thinggummy

(11) The trusses and roof all done:

11-Trusses and Roof

(12) It’s cool under the roof:

12-Cool Under Roof

(13) Time for a break!

13-Break Time

(14) Jess and his truck. I would kill for this truck. But I wouldn’t take on Jess.

14-Jess and Truck

(15) The roof all covered with shingles. And that truck.

15 Roof Shingles

(16) Shingles and beginning the siding:

16-Shingles and Siding

(17) The loading dock:

17-The Loading Bay

We’re now awaiting the delivery of our windows, which has been delayed slightly. After the windows are installed, the rest of the siding can go up. A scattering of doors, and Bongo-Mongo! we have the basics of a building.

Stay tuned. More to follow.

Next Page »