New Mobius Factory Update …
The windows were installed, so now the walls can go up –
(1) Wrapping Tyvek all around (keeps out the wet):
(2) Up goes the siding:
(3) Jess trimming and caulking:
(4) Trim around windows! Trim around doors!
(5) The back windows:
(6) The view out the back windows:
(7) Awaiting the big door, and watching out for cats:
The big door is scheduled for installation in about a week, and the electrical panel is going in soon. Then a visit from the Building Inspector. He’s just a fine fellow!
Stay tuned. More to follow.